Listed below are ‘turnkey service’ case studies in which Energys Services Limited have surveyed clients’ needs, prepared project assessments and undertaken the supply and installation of  Save It Easy®  converters.

When test conversion of 980 4ft T8 lamps yielded savings of 137,356 kWh per annum it proved possible to mobilise budget for a total site roll-out involving a further 18,536 tubes. Annual energy cost savings now exceed £52,000 with annual CO2 savings of over 550 tonnes. ... Read More...
Energys Services Ltd completed Conversion of 1,210 lamps across this multi-building site within one month of go-ahead. The project followed success of an 840 lamp trial installation and site-wide conversion now yields energy cost savings of £22,590 and CO2 savings of 148 tonnes annually. ... Read More...
Treating some 400,000 sick children each year, Alder Hey Children’s NHS Foundation Trust works round the clock 365 days a year. By upgrading the performance of over 9000 lamps with Save It Easy® a major energy and cost saving has been achieved. ... Read More...
Conversion of 1200 T8 tubes to T5 operation during the October half term break required the sort of tight and reliable scheduling for which Energys Services Ltd is known. The result has been a saving of some 136,000 kWh of electricity and 58.60 tonnes of CO2 per year. ... Read More...